Commercial facility services · Licensed · Insured · Bonded
contact@blueskygeneralserv.com · (781) 558-3458 · Instagram
Full facade of the Orange County Government building with palm tree in foreground
Rope-access window cleaner working on the multi-story facade of the Orange County Government building
Upward view of the Orange County Government tower elevation
Water-fed pole scrubbing upper-floor courthouse glass above the downtown Orlando skyline
Orange County Government · Orlando, FL

High-rise glass,
cleaned on rope.

A multi-story public courthouse with a full glass facade. No boom lift access on most elevations, no business-hour disruption to staff or citizen visits. BlueSky executed the program through documented rope-access window cleaning, scheduled around the building's operating cycle.

Orlando, FLLocation
Multi-storyPublic courthouse
Rope accessPrimary method
Off-hoursScheduled around staff
The Challenge

A public-facing courthouse facade where boom lift was not the answer.

The Orange County Government building is a multi-story public facility with an extensively glazed exterior that the public sees every day. Most elevations could not be reached cleanly with a boom lift, either because of pedestrian flow at street level, parking constraints, or building geometry that put the lift's reach outside the right working angle.

And it is a courthouse: staff and citizens move through the building on a daily schedule that the cleaning program had to respect, not interrupt.

The Scope

A documented rope-access program, scheduled around the building.

BlueSky deployed certified rope-access technicians for the elevations the boom lift could not reach. The program was sequenced so the visible facade was completed before staff arrival, with documented anchor checks, tie-off verification, and pedestrian-control plans on every shift.

  • Rope access on full-height elevations
  • Boom lift on lower-elevation segments where geometry allowed
  • Documented OSHA-aligned tie-off and anchor verification
  • Pedestrian-control plans for street-level work
  • Off-hours scheduling around staff and citizen-visit windows
  • Shift-by-shift completion sign-off
  • Photo documentation of each elevation served
Measured Results

What the program delivered.

A multi-story public building with a clean, presentation-ready facade on every cycle, executed without interrupting the people who use it.

Multi
Story facade
Full-height elevations served on every cycle.
Rope
Primary access
Certified technicians on documented anchors.
Zero
Operating disruption
Work scheduled around staff and citizen flow.
OSHA
Aligned safety
Tie-off and anchor verification logged per shift.
01 / 03
Field Footage · Rope Access

What the work actually looks like, mid-shift.

Three short clips from the courthouse program. Certified technicians on verified anchor systems, working vertical runs of glass on a multi-story public building. No boom lift, no scaffold, no interruption to the building's day.

Explore Window Cleaning →
The right access method, the right schedule, and the safety paperwork done. The facade gets cleaned and the building keeps running.
Facility services lead · Public courthouse, Orlando FL

High-rise glass on your building?

Request a proposal, we will scope rope access, lift, or waterfed pole methods alongside the right scheduling for the building's occupants.